Technical Strength & Infrastructure
European-grade plant and machinery, a six-phase project methodology and a five-stage QA/QC chain, engineered to deliver façade and glazing scope on schedule.
Project Management Methodology
Six structured phases govern every ADI project, from tender study through post-handover support.
- 01Scoping
Tender study, scope mapping into major item heads, SOPs for sourcing, deployment, QA/QC and statutory compliance.
- 02Design & Planning
System design and engineering calculations per wall type. Shop drawings, BOM, master & micro schedules, communication protocols.
- 03Production
Capacity-based production plan. Prototype build & QA/QC for each wall type, then bulk fabrication and dispatch.
- 04Installation
Total-station survey, bracket setting, mock-ups tested with consultants, phased installation under European QA/QC procedures.
- 05Finishing & Handover
Skilled finishing team rectifies snags, finalises documentation and obtains sign-off from PMC / client representatives.
- 06Maintenance
Training for facility management, operation & maintenance documentation, defined support system through the maintenance period.
European-grade fabrication equipment
A core fleet of imported precision machines across our Sonepat facility, supported by a heavy site-tooling inventory.
| Equipment | Make | Country | Capacity |
|---|---|---|---|
| Silicone Pump | Graco | USA | Two-component structural / weather sealant |
| Double Head Cutting Machine | LGF | Italy | Aluminium profile cutting · ±0.1 mm tolerance |
| Routing Machine | FOM Industries | Italy | Multi-axis profile routing & milling |
| CNC Machining Center | AXYZ Automation | Canada | ACP / composite panel CNC routing |
| Laser & Drill Machines | HILTI | India | Site layout, anchor drilling & rotary hammer |
| Cradle / Hoist System | Wuxi Zhenda | China | Suspended access platforms for façade installation |
| Drill Machines (×150) | Bosch | Germany | Site fabrication & installation tooling fleet |
QA/QC Process, five checkpoints
Every project passes through a documented chain of quality gates from design to test.
Engineering calculations, shop-drawing reviews and approval gates before any production starts.
Mill test certificates, finish samples and sample approvals for every aluminium, glass, ACP and gasket batch.
Stage-wise fabrication and glazing check cards with photo documentation against shop-drawing tolerances.
Installation check cards, NCR tracking and on-site supervision under European QA/QC procedures.
AAMA 501 / ASTM E283 / E331 water and air infiltration tests on installed mock-ups.
A balanced engineering & site team
Engineering, execution and skilled trades, sized for concurrent multi-project delivery.