European-grade plant and machinery, a six-phase project methodology and a five-stage QA/QC chain, engineered to deliver façade and glazing scope on schedule.

Section 01 · Methodology

Project Management Methodology

Six structured phases govern every ADI project, from tender study through post-handover support.

  1. 01
    Scoping

    Tender study, scope mapping into major item heads, SOPs for sourcing, deployment, QA/QC and statutory compliance.

  2. 02
    Design & Planning

    System design and engineering calculations per wall type. Shop drawings, BOM, master & micro schedules, communication protocols.

  3. 03
    Production

    Capacity-based production plan. Prototype build & QA/QC for each wall type, then bulk fabrication and dispatch.

  4. 04
    Installation

    Total-station survey, bracket setting, mock-ups tested with consultants, phased installation under European QA/QC procedures.

  5. 05
    Finishing & Handover

    Skilled finishing team rectifies snags, finalises documentation and obtains sign-off from PMC / client representatives.

  6. 06
    Maintenance

    Training for facility management, operation & maintenance documentation, defined support system through the maintenance period.

Section 02 · Plant & Machinery

European-grade fabrication equipment

A core fleet of imported precision machines across our Sonepat facility, supported by a heavy site-tooling inventory.

EquipmentMakeCountryCapacity
Silicone PumpGracoUSATwo-component structural / weather sealant
Double Head Cutting MachineLGFItalyAluminium profile cutting · ±0.1 mm tolerance
Routing MachineFOM IndustriesItalyMulti-axis profile routing & milling
CNC Machining CenterAXYZ AutomationCanadaACP / composite panel CNC routing
Laser & Drill MachinesHILTIIndiaSite layout, anchor drilling & rotary hammer
Cradle / Hoist SystemWuxi ZhendaChinaSuspended access platforms for façade installation
Drill Machines (×150)BoschGermanySite fabrication & installation tooling fleet
Section 03 · Quality Assurance

QA/QC Process, five checkpoints

Every project passes through a documented chain of quality gates from design to test.

01
Design Quality

Engineering calculations, shop-drawing reviews and approval gates before any production starts.

02
Material Sourcing

Mill test certificates, finish samples and sample approvals for every aluminium, glass, ACP and gasket batch.

03
Production

Stage-wise fabrication and glazing check cards with photo documentation against shop-drawing tolerances.

04
Installation

Installation check cards, NCR tracking and on-site supervision under European QA/QC procedures.

05
Testing

AAMA 501 / ASTM E283 / E331 water and air infiltration tests on installed mock-ups.

Section 04 · Manpower Strength

A balanced engineering & site team

Engineering, execution and skilled trades, sized for concurrent multi-project delivery.

4
Design Engineers
4
Execution Engineers
20
Peak Skilled Workers
30
Semi-skilled Workers